Empresas Y&V / DRV Construcciones
|
Projects
1. Flow station and gas compression plant in Mata 8
This projects includes engineering and constructions of flow station and gas compression plant of 40 MMscfd in Mata 8, Perez Companc’s Acema fields.
2. Injection chemistries production facilities
It consists in engineering, construction and initial operation of the equipment and pumps systems for the injection of asfalteno dispersing chemistries in the production pipes of manifold 1, in the Furrial.
3. The Snack Plant
In Santa Cruz de Aragua was constructed the snack plant. This projects includes the construction of the main shed of processes and the services building, in an approximated area of 6.000 m2.
4. El Tiempo News Paper, new seat
Actually we constructed the new seat of this important newspaper on the east of the country. The first stage was concluded in the year 2000 the second phase of the project in the middle of the year 2002. The construction included: The rotating building factory, the warehouse building, the administrative building and outer works.
5. Pepsi-Sopresa Bottling plant
The modern Pepsi bottling plant in Zulia state was designed and constructed to a cost of 16 MM $, with an approximated area of three hectares of construction. This project was executed in partnership with Guinand y Brillembourg company
|